LATEST NEWS
August 6, 2008
KWH Contractors of British Columbia win Suncor contract
A company from Delta, B.C. has been awarded a contract for a structural steel modular construction project at Suncor’s Voyageur expansion program, in Fort McMurray, Alberta.
Suncor Energy began construction of the $20.6 billion Voyageur project in March 2007.
The expansion plans include the construction of a third oilsands upgrader in Fort McMurray to convert bitumen into higher-value crude oil, expanded bitumen production, and various infrastructure and utilities.
The new upgrader is being constructed about half a kilometre southwest of existing Suncor upgrader facilities near the North Steepbank extension and Millennium mines.
Empire Industries Ltd. announced that a wholly-owned subsidiary won a subcontract worth more than $12 million.
“Empire has more than tripled its field installation and shop fabrication capacity over the past two years and is in an excellent position to fulfill these types of contracts,” said Guy Nelson, CEO of Empire.
Ideal Welders Ltd. (IWL) awarded the subcontract, which calls for the assembly of 179 modules, totaling more than 5,000 tonnes of structural steel at its module yard outside Edmonton.
The modules are about 24 feet high, by up to 120 feet long.
“We started assembly in October of this year and the work will be undertaken over a period of about 15 months,” said Jeff Mullins, president of KWH Contractors, which is a subsidiary of Empire Industries.
“About 20 modules will be worked on at the same time and there will be a continual flow of modules being built and shipped to the site.”
IWL has the main contract with Suncor for pipe fabrication, installation and modularization.
“This is the first time a B.C. division of the company has been involved in upgrader construction,” said Mullins. “This is a strategic move by Empire Industries to get more involved in the upgrader construction market.”
Project Voyageur, which is the centrepiece of Suncor’s growth strategy, is a multi-phase plan to increase oil sands production to more than 550,000 barrels a day by 2010–2012. This represents a 120 per cent increase over 2004 production.
The construction of the upgrader will employ about 4,000 workers.
Empire Industries Ltd. is a steel fabrication and construction service provider that operates its business through four wholly owned subsidiaries.
| MOST POPULAR STORIES |
- Contractors, unions disagree on Canadian government’s fast-track immigration proposal
- New Thunder Bay-to-Alberta shipping route handles cargo bound for oilsands
- Canadian construction industry steels against rising rebar prices
- Victoria’s Dockside Green community achieves LEED Platinum certification
- For a profitable crop, try harvesting the wind
- 20 Most Popular Stories
| CURRENT STORIES |
- Golden Ears Bridge takes shape over Fraser River in British Columbia
- Unionized construction workers in British Columbia subject to new drug policy
- Vancouver Island construction companies feeling the pinch from rising B.C. Ferries costs
- Warm summer days and legal risk
- Work at Vancouver’s Vita at Symphony Place continues
- Vancouver architect extolls the virtues of wood for sustainable building
- Saskatchewan changes temporary worker program
- EllisDon wins contract for Education Centre in Calgary, Alberta
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Industrial Construction is Resource-related (August 28, 2008)
- Construction Starts are Down about One-quarter So Far this Year (August 22, 2008)
- Canada’s Slide in Housing Starts Begins (August 21, 2008)
Lifestyle Blog More 
- What’s Red, Pretty and Prickly? (August 26, 2008)
- What’s Happened to Jokes Isn’t Funny (August 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Salter Pilon Architecture Inc. wins contract to design Bradford recreation centre (Aug 22, 2008)
- Shore Tilbe Irwin & Partners begin designs for LEED Silver-compliant community centre (Aug 22, 2008)
- Salter Pilon Architecture nears completion of Georgian Manor working drawings (Aug 22, 2008)
- Town of Markham proposes new LEED-compliant Cathedral Town firehall (Aug 22, 2008)
- Townline Group plans redevelopment of former Fantasy Garden World property (Aug 18, 2008)
